International financial institution projects

Please read more...

International financial institution projects

  • National plan for hazardous waste management of Kosovo (World Bank project) – Subcontractors
  • Environmental & social impact assessment (ESIA) of Milot-Morine highway project in Albania (IFC project) – Subcontractors

Environmental and social impact assessments (EIA, ESIA)

Please Read More...

Environmental and social impact assessments (EIA, ESIA)

  • EIA of the upgrade and operation of the Eden Beach Resort Hotel (700 beds) – Contractors
  • EIA of the Henry Durant Hospital Center (460) – Contractors
  • EIA of the installation and operation of the production unit of actocancer drugs of Regulon at Koropi, Athens, Greece
  • EIA of several ready mix concrete plants of LAFARGE in Greece – Contractors
  • EIA of the wastewater treatment plants of Amfissa, Greece (14,000 p.e) – Contractors
  • EIA of the museum of the Hellenic Nobel collection, Attica, Greece – Contractors
  • SEA of the open city spatial and residential plan of the Municipality of Delphi – Contractors
  • EIA of the Metaxa cancer hospital of Piraeus (420 beds) – Contractors
  • EIA of the Tzanio general hospital of Piraeus (488 beds) – Contractors Many hotels in Greece – Contractors

Water and wastewater management projects

Please Read More...

Water and wastewater management projects

  • Technical support of the Ministry of Environment for the recording of problems in implementing Directive 98/83/EC on drinking water in Greece and the exploration of possibilities to adopt Water Safety Plans – Subcontractors
  • Design of the wastewater treatment plant of Kolimbari, Chania, Crete (30,000 p.e.) – Subcontractors
  • Design of the wastewater treatment plant of Amfissa (14,000 p.e.) – Subcontractors
  • Design of the wastewater treatment plant of Erythres (10,000 p.e.) – Subcontractors
  • Design of the wastewater treatment plant of Eptalofos (2,500 p.e.) – Subcontractors
  • Design of the wastewater treatment plant of Eden Beach Resort Hotel, Attica,  (700 p.e.) – Contractors

Contaminated site assessment and remediation

Please Read More...

Contaminated site assessment and remediation

  • IED Baseline Report for a large steel industry in Attica, Greece – Subcontractors
  • Soil and groundwater contamination risk assessment of cement factories, Greece – Subcontractors
  • Soil and groundwater contamination risk assessment of the uncontrolled waste disposal site of Municipality of Megara – Subcontractors
  • LIFE+ Environment Policy and Governance 2010: Chromium in Asopos groundwater system: remediation technologies and measures – Research team members www.charm-life.gr
  • Basic Research Support Program: Investigation of the effect of sulfate on bioremediation of groundwater contaminated with chlorinated hydrocarbons – Research team member
  • Pythagoras Environment I: Soil contaminated with chlorinated hydrocarbons: biological reductive remediation processes – Research team member

Other services

Please Read More...

Other services

  • Technical consultancy services on environmental management (e.g., preparation of baseline reports for industries, conducting environmental audits, conducting environmental monitoring programs)
  • Investigation of environmental conditions and permitting of the green data center of GRNET in Louros River – Contractors https://www.grnet.gr/en/node www.charm-life.gr